When your boiler fails or starts underperforming, replacing it becomes urgent, especially during a chilly London winter. But one of the first questions many homeowners ask is: How long does it take to install a new boiler?

At Maintracts Services Ltd, we carry out new boiler installations in London with speed and precision, all while ensuring minimal disruption to your home. Whether it’s a like-for-like swap or a full system upgrade, this guide will help you understand the boiler installation timeline, what influences it, and how we make the process as smooth as possible.

Seeking assistance with a quick and reliable boiler replacement? Contact our team on 020 8682 2244 or email info@maintracts.co.uk to get started today.

“Need heat and hot water back fast? Our expert engineers handle every step of your boiler installation efficiently—without cutting corners.”

What Affects The Duration Of A New Boiler Installation?

On average, a new boiler installation in London takes between 1 and 3 days; however, various factors can influence this timeline. Let’s look at them in detail.

1. Type Of Boiler Being Installed

  • Combi to combi boiler swap: This is the quickest installation, often completed within one working day.
  • System or regular to combi conversion: This can take 2–3 days, as it often requires removing tanks and adjusting pipework.
  • System upgrade or relocation: Relocating your boiler or switching to a different system type involves additional labour, extending the boiler fitting duration.

2. Condition Of The Existing Heating System

Old or poorly maintained systems may require extra steps:

  • Pipework may need upgrading
  • Radiators may require flushing
  • Iron oxide buildup may call for a powerflush before the new boiler is fitted

Our engineers always assess the system beforehand to minimise surprises and reduce the boiler replacement timeline.

3. Boiler Location And Access

Moving a boiler from a utility room to a loft, for example, adds time and effort. Complex routing for pipework and flues also extends installation time.

Boiler Installation Steps Explained

Let’s walk you through the typical boiler setup process so you know what to expect on installation day.

1. Site Survey (Before Installation Day)

We carry out a full survey to determine:

  • The right boiler for your property
  • Any safety or access concerns
  • Potential upgrades or changes to your current system

This pre-install step is key to delivering a swift and smooth same-day boiler installation in London when needed.

2. Removing The Old Boiler

Taking out your old unit takes 2–4 hours, depending on its location and complexity. We dispose of it in an eco-friendly and safe manner.

3. Pipework, Filters And Heating Connections

Next, we:

  • Fit new filters and valves
  • Make pipework changes for your central heating system
  • Connect the new boiler to your hot water system

This is usually the most time-consuming stage, particularly if upgrading from a traditional boiler to a combi.

4. Gas Safe Installation And Testing

Our engineers are fully Gas Safe registered, and we install your new boiler in full compliance with UK safety standards. We test everything—gas pressure, connections, and control systems—to ensure the boiler runs safely and efficiently.

5. System Commissioning

We check and balance your heating system to ensure all radiators heat evenly. We also calibrate settings for maximum efficiency.

6. Demonstration And Handover

Before we leave, we will show you how to operate your new boiler, thermostats, and timers. You’ll also receive warranty documents and your Gas Safety Certificate.

How Maintracts Minimises Installation Disruption

As trusted London boiler installation experts, our process is designed to get your home back to normal as quickly as possible:

  • Clear scheduling and communication
  • Pre-planned installation materials and fittings
  • Quick diagnostics and problem-solving
  • Neat, professional workmanship every time

For landlords, we also handle landlord boiler installation in London, ensuring compliance and minimal tenant disruption.

Other Factors That Affect Boiler Installation Time

1. Building Regulations And Safety

Modern boilers must comply with stringent regulations. We may need to install:

  • Condensate pipes
  • Flue kits
  • A pressure-reducing valve

All of which take extra time, but are essential for long-term safety.

2. Optional Upgrades

Adding smart thermostats, filters, or zoning controls to your boiler installation in London can extend the time it takes to complete, but the long-term energy savings are well worth it.

3. Relocation Or System Change

Switching from a system boiler to a combi? Relocating the boiler? These changes affect the combi boiler fitting schedule, especially when it involves:

  • Floorboard removal
  • Electrical rewiring
  • Drain reconnections

Installation Timelines By Boiler Type

Boiler Type Estimated Time
Combi to combi (same location) 1 day
System to combi 2–3 days
Boiler relocation (any type) +1 day
Full heating system upgrade 3–4 days

 

If you're looking into modern solutions, our electric boiler installation in London blog explains the benefits of switching and outlines the typical installation time.

Preparing For Installation Day

You can help speed things up by preparing your home:

  • Clear access to the boiler and radiators
  • Ensure someone is home for access
  • Move valuables or fragile items from work areas
  • Inform us of pets or any special requirements

Proper preparation supports an efficient boiler fitting schedule.

What Happens After The Installation?

Once the boiler is installed, we’ll:

  • Register your warranty with the manufacturer
  • Provide your Gas Safety Certificate
  • Offer advice on maintenance and servicing

If your property is residential, check our complete guide to home boiler installation in London for budget planning and installation expectations.

Conclusion

So, how long to install a boiler? Most installations take 1–3 days, but this timeframe varies depending on the type of system, boiler location, and any upgrades involved.

At Maintracts Services Ltd, we’ve spent decades refining our process to deliver reliable, efficient, and compliant installations across the capital. Whether you're upgrading to a combi, switching to electric, or managing property installations, we’ve got the expertise to get the job done right.

Speak to a trusted expert today—call us on 02086822244 or email info@maintracts.co.uk to book your survey or request a free quote.

FAQs

1. How long does a standard boiler installation take?

Most combi-to-combi installations in the exact location are completed in a single day.

2. Can I get emergency boiler installation in London?

Yes—we offer same-day boiler installation in London, subject to engineer availability and system requirements.

3. Will I need to upgrade my heating system?

Not always. However, if your system is outdated or inefficient, a heating system upgrade may be beneficial in the long term.

4. Do you handle installations for landlords?

Absolutely. We specialise in landlord boiler installation in London and ensure all compliance requirements are met.

5. What about electric boiler options?

We offer the installation of electric boilers as part of future-ready solutions. Learn more in our guide to electric boiler installation in London.